— Hospitality Portfolio

Five-star hotels, fully delivered across Nigeria.

Each property in this portfolio was handed over to its operator on schedule, meeting the structural, mechanical, and finish standards required for international five-star grading. The buildings are the record.

/ Completed Properties

Four properties. Each graded. Each handed over.

Structural delivery, MEP coordination, and finish execution across all four assets met the client brief without scope reduction. Timeline constraints were absorbed, not passed on.

Lagos · 2019
Abuja · 2021
Port Harcourt · 2022
Enugu · 2023

Victoria Crown Plaza Hotel

Transcorp Hilton Annex

Meridian Grand Hotel

Skyline Continental Hotel

32-storey mixed-use tower. Full MEP fit-out, curtain wall system, and interior finish to international grading standard.

18-storey annex structure. Structural integration with existing hotel block, phased delivery to keep operations uninterrupted.

Low-rise resort complex. Site engineering on reclaimed terrain, full infrastructure provision, and landscape integration.

12-storey urban hotel. Compressed programme, full structural and mechanical delivery, brand standard fit-out achieved.

Overhead wide shot of an active high-rise hotel construction site in Nigeria — tower crane visible at left, concrete floor plates at multiple levels under construction, safety netting and formwork in precise arrangement, workers coordinating below in high-visibility vests, natural overcast daylight, documentary aerial framing establishing site scale and operational complexity
Overhead wide shot of an active high-rise hotel construction site in Nigeria — tower crane visible at left, concrete floor plates at multiple levels under construction, safety netting and formwork in precise arrangement, workers coordinating below in high-visibility vests, natural overcast daylight, documentary aerial framing establishing site scale and operational complexity
+ Documented On Site

Execution recorded, not reconstructed.

These sequences were filmed during active construction phases — structural pours, facade installation, MEP coordination — and at handover. No retrospective staging.

Runtime covers four completed hotel sites. Each clip is tied to a specific project phase and delivery milestone.

The next property on this list is the one you bring to us.

Bring us the constraints — site, programme, grading target, timeline. We will scope it, plan it, and build it to standard.